Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.
Luna's Curve | Blue Sapphire Vintage Engagement Ring.

Luna's Curve | Blue Sapphire Vintage Engagement Ring

$599.00
$999.00
20% OFF Code: BESPOKE20
Fastest Bespoke: 7 Days
Pay in 4 interest-free installments with Klarna/Afterpay
Material
  • Yellow Gold Plated 925 Silver
  • Rose Gold Plated 925 Silver
  • White Gold Plated 925 Silver
  • 10K Yellow Gold
  • 10K Rose Gold
  • 10K White Gold
  • 14K Yellow Gold
  • 14K Rose Gold
  • 14K White Gold
  • 18K Yellow Gold
  • 18K White Gold
  • 18K Rose Gold
  • 950 Platinum
Main Stone
  • Natural Sapphire
Ring Size
  • 4
  • 4.5
  • 5
  • 5.5
  • 6
  • 6.5
  • 7
  • 7.5
  • 8
  • 8.5
  • 9
  • 9.5
  • 10
  • 10.5
  • 11
  • 11.5
  • 12
  • 12.5
  • 13
pc_5
bg-loobook




DETAILS

DESCRIPTION

Some promises are not spoken—they are felt, like the pull of the tide or the quiet constancy of moonlight. Luna's Curve honors those unspoken vows with a design that speaks the language of eternal rhythms. The curved band wraps around the finger in an endless embrace, its vintage details whispering of love stories from another time, while the blue sapphire glows with the steady, faithful light of a moon that has watched over lovers for centuries. For the one whose love is your constant, through every phase and season.

*Ethically Sourced Genuine Sapphire, crafted with care and conscience for the conscious wearer. Each piece is handcrafted with Solid 14k/18k gold / platinum in your choice.

*Gem: Blue Sapphire, Moissanite

*Gem Size: Approximately 7mm*9mm.

*If you'd like to view a specific stone, please feel free to reach out. I would be pleased to provide photos for you to make your selection.

*Packaging: Presented in a stylish, eco-friendly gift box.

*Customization: Message us and personalize your ring to your liking, making them a truly one-of-a-kind addition to your collection.


Size Chart
Please click here to view the Size Chart   
The best way to find your ring size is to visit a local jewelry store for professional sizing, or use a ring sizer tool for accurate results.
Shipping & Return
All jewelry is estimated to be delivered within 2-4 weeks after payment is received, depending on order details. Please read our Shipping Method & Order page for more information.

Please contact us at info@stellaradorn.com if you wish to return or cancel your order. Read our full returns policy on our Return & Exchange page.
  • Ethically Sourced
  • 100% Handmade
  • 1-Year Warranty
  • 100% Customization
Please Note
‒For the best showcase effect, product images may include model photography. Please note that colors, sizes, and details may appear slightly different due to lighting and display settings. The actual product may vary slightly—please refer to the physical item for accuracy.
‒Dimensions are manually measured, with slight variations possible due to craftsmanship. These minor differences enhance the unique, handmade quality, ensuring every piece is truly one of a kind.

Product Care:

‒Keep your moissanite 925 silver jewelry sparkling with these simple care tips. 
Avoid contact with chemicals like perfumes, lotions, and cleaning agents to prevent tarnishing.
‒Protect your silver from scratches and deformation by storing it in a dry, soft-lined pouch. 
‒Clean your jewelry regularly with warm water, mild soap, and a soft cloth—skip harsh brushes or abrasive cleaners. If tarnishing occurs, restore shine with a silver-cleaning cloth. 
‒Perfect for everyday wear or special occasions, proper care ensures your 925 silver jewelry with moissanite stones stays brilliant and long-lasting. Enjoy timeless elegance with minimal maintenance.
Illuminate Your Brilliance
03_2139f818-d639-49d4-8d16-b12f61a4f10d

Silver · Eternal Radiance

Crafted from 925 pure silver, a symbol of timeless elegance and enduring quality.
 Experience the classic brilliance that transcends generations.
06_eb497cee-3192-4af9-9707-b46163630137

Moissanite · Eternal Radiance

Outshining diamonds in brilliance, sustainability, and ethical value. 
A smarter, more conscious choice for the modern legacy.
10_dbf4993e-92b0-4c57-b8c2-d43d20d13115

Your Purchase is Protected

We offer a 30-day return policy and 1-year quality warranty for worry-free shopping. Rest assured, every piece meets our stringent quality standards.
There are no product yet!
pc_e0e2c313-9dc6-4b5f-b271-24f6ae9f5134

Make it Yours

Personalize your piece by selecting different gemstones or changing the metal plating color to suit your style. Please contact our customer service team first and leave a note at checkout.
Please Note
For the best showcase effect, product images may include model photography. Please note that colors, sizes, and details may appear slightly different due to lighting and display settings. The actual product may vary slightly—please refer to the physical item for accuracy.
‒Dimensions are manually measured, with slight variations possible due to craftsmanship. These minor differences enhance the unique, handmade quality, ensuring every piece is truly one of a kind.
Product Care
Keep your moissanite 925 silver jewelry sparkling with these simple care tips. 
Avoid contact with chemicals like perfumes, lotions, and cleaning agents to prevent tarnishing.
Protect your silver from scratches and deformation by storing it in a dry, soft-lined pouch. 
Clean your jewelry regularly with warm water, mild soap, and a soft cloth—skip harsh brushes or abrasive cleaners. If tarnishing occurs, restore shine with a silver-cleaning cloth. 
Perfect for everyday wear or special occasions, proper care ensures your 925 silver jewelry with moissanite stones stays brilliant and long-lasting. Enjoy timeless elegance with minimal maintenance.
Sustainable
Our jewelry is crafted with sustainability in mind, using eco-friendly materials and ethical practices. Each piece is made to last, with maximum recyclable packaging. Choose timeless elegance that supports both beauty and a greener future.
lo
Brilliance That Lasts
100% Hand-Set 
Exceptional Quality
hb
Sustainably Made
Conflict-Free Gems
Maximum Recycled Materials
y
Premium Service
Free Shipping
Easy Return
1_1c20a6aa-50ae-47c9-b514-0188034f9c55
Trusted By Thousands
Loved By Customers Worldwide